KTS Power WashingSITE WORK · CLEARFIELD UT File an order
KTS POWER / Operations

How an order
is cut.

Five benches from order to close — the same method whether the cut is a trench or a building.

BENCHES 01–05

The profile
run.

Each bench produces a record — that's how orders stay marked, not just open.

BCH·1File

Order filed

The client states the scope and the station; the office answers with a written order — station, cut and timeline named before digging.

BCH·2Dig

Station dug

The station cuts on the profile — scope and timeline marked, the order updated before the surface goes down.

BCH·3Run

Lines run

The work runs under the order — cuts filed, surfaces laid, status reported, everything marked to the same profile.

BCH·4Issue

Client issued

The client receives the cut — surfaces and status reported on a set cadence, not on request.

BCH·5Close

Order closed

The order closes with the profile reconciled — station, cut and sign-off handed over and kept for reference.

DOCTRINE

Rules the profile
cuts by.

Doc · 01

Ordered first

No dig before the order — a written profile in place of a handshake.

Ordered first
Doc · 02

Profile over memory

Cuts and surfaces live on the profile — the record, not recall, is the truth.

Profiled record
Doc · 03

Marked entry

Stations and scopes checked before digging — the cut stays open only if it's marked.

Marked entry
Doc · 04

Site-safe

Records and orders handled under the office's terms — segregated, disclosed only as required.

Secured site
Doc · 05

Order handed over

Station, cut and sign-off go to the client at close — the record is theirs.

Client-owned
Doc · 06

Scope is plain

What's dug and what's not is stated on the order — exclusions named, not assumed.

Plain scope
INQUIRIES

Asked at
the office.

Describe the scope and the station — the office answers with a written order including station, cut and timeline. Nothing digs without the order on file.

Both run on the same profile — excavation cuts under one station, paving under another. The order names which station.

A written deliverable — station dug, lines filed, surface stated with the cut named. It goes on the same profile as the rest.

Frequently — a site that needs both excavation and paving touches two stations. The order names the stations and the job runs as one profile.

File the order,
on the cut.

Describe the scope, the station and the timeline — the office answers with a written order.

File an order